FAQ

  • 1. What industries mainly serve?

    We specialize in providing high-precision mold manufacturing and injection molding solutions for industries including automotive, home appliances, consumer electronics, medical devices, and industrial equipment.

  • 2. How do we ensure the quality of molds and parts?

    Quality is controlled through a comprehensive system, including mold flow analysis, strict material certification, in-process inspections, and final product testing. We also provide complete documentation such as steel certificates, hardness reports, and dimensional inspection reports.

  • 3. What is our typical lead time for mold manufacturing and mass production?

    For mold making, the lead time is typically 4–6 weeks after design approval. For mass production of plastic parts, it usually takes 2–3 weeks depending on part complexity and order quantity.

  • 4. Do we offer design support for new product development?

    Yes, our engineering team provides full support from DFM (Design for Manufacturability) analysis to mold design optimization, helping customers accelerate product development and reduce production risks.

  • 5. What is our standard payment terms?

    Our standard terms are 50% deposit upon order confirmation and 50% balance payment before shipment. Flexible payment arrangements can be discussed based on project scope and cooperation level.

  • 6. Can we handle small batch orders or prototype development?

    Absolutely. In addition to mass production, we offer low-volume manufacturing, rapid prototyping via 3D printing and silicone molding, ensuring customers can quickly validate designs before full-scale production.

Get the latest price? We will reply as soon as possible (within 12 hours)